Assetto Corsa PC Mods General DiscussionPC 

  • Thread starter Thread starter daan
  • 158,259 comments
  • 52,269,690 views
The heck is this now? What browser is CM using apparently to display the map thing?
1713100763408.png
 
I was able to correct the discomfort in the cockpit. I have also applied the Mr.VR Driving data file and updated to BETA2, so please use it. The link has also been updated.
As written in the release notes, the detailed correction work is as follows:

・Physical behavior by Mr.VR Driving.(Thank you very much to Mr. VR Driving)
・The bottom of the floor was lowered to the same position as the bottom of the body, and unnecessary polygons were removed accordingly.
・The seat has been moved forward.
・I determined that the reclining part of the seat was small, so I enlarged it and adjusted the angle to fit the driver model.
・The position of the steering parts (including the column and surrounding dash parts) has been corrected based on the driver model's perspective. This modification makes the instrument panel easier to read.
・Due to the above correction, the driver position in AC has been readjusted.
・Changed the shader of the spokes of the rim.View attachment 1346459View attachment 1346460View attachment 1346461Please look forward to the next update for other revisions!View attachment 1346455View attachment 1346458
thank you for this amazing thing

a few ideas

There is an opening at the corner of the front glass window
Fully working analog displays
total kilometer and trip km meters
and warning lights working on the dashboard
 

Attachments

  • Adsız.png
    Adsız.png
    138.6 KB · Views: 29
But the main differences in this pictures is NOT LCS. This has more to do with postprocessing and a different taste. If this is the same time/date, why should it be so bright in nighttimes.

Here is a current comparison between a MATCHED gamma and lcs integration:

With the next Pure version you can test this, but only for daytimes. There are thousands of little problems to be solved and as you see in the picture also in CSP the shaders will also need many work. But we should actually see it as a techdemo, BUT the differences are on shader level and NOT postprocessing. Gamms vs. LCS is not a brighter or more contrast picture or what so ever. The differences are a different math when calculating color / lights in the shader. So the overall picture should look the same in terms of brightness and contrast.

So here you can see a good example of how colors are differently calcualted:

And this results in a different presentation when you have many structures with different lights and shadows in the view. That is where LCS shines. Also the fog algorithm was changed with the LCS shaders:
Peter,

first of all, THANK YOU for everything you have done for AC and the entire community, I do admire and am grateful for your work. You, together with ilija, have pushed AC so far that no one could even dream of.

It is possible that you are right and the differences are not that great and depend largely on the gamma curve settings. I simply compared standard settings combined with popular ppfilters. The fact is that in many cases the difference - to my eyes - was noticeable. I don't know what it depends on, but on some tracks the change was no longer spectacular and the effect resembled a cartoon (someone already mentioned it) - e.g. Longford 1960s.

The great thing is that there are always new improvements for AC, I'm looking forward to the new mist version for pure.

Thanks for everything, Peter!
 
I was able to correct the discomfort in the cockpit. I have also applied the Mr.VR Driving data file and updated to BETA2, so please use it. The link has also been updated.
As written in the release notes, the detailed correction work is as follows:

・Physical behavior by Mr.VR Driving.(Thank you very much to Mr. VR Driving)
・The bottom of the floor was lowered to the same position as the bottom of the body, and unnecessary polygons were removed accordingly.
・The seat has been moved forward.
・I determined that the reclining part of the seat was small, so I enlarged it and adjusted the angle to fit the driver model.
・The position of the steering parts (including the column and surrounding dash parts) has been corrected based on the driver model's perspective. This modification makes the instrument panel easier to read.
・Due to the above correction, the driver position in AC has been readjusted.
・Changed the shader of the spokes of the rim.View attachment 1346459View attachment 1346460View attachment 1346461Please look forward to the next update for other revisions!View attachment 1346455View attachment 1346458
It's quite a bit nicer to drive now. The FFB is much improved from beta 1, but it could still use a little more detail, as the handling still feels a bit vague at times. Higher tire slide audio levels might help as well. The textures are quite nice, and the canopy design is particularly interesting from the driving position when you look right (not pictured).

My biggest remaining issue is the engine sound, which has a very prominent loop while on-throttle. It's less present if you switch to external sounds, but then you miss out on the nice gear change chunks.

I also noticed that the headlights don't stay on for some reason. I so far have only tested the mod with LCS on; I'll have to see if they work properly in Pure.

An interesting mod overall, and worth a little more tweaking to iron out the remaining wrinkles.
 

Attachments

  • Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_13-3-124-19-18-4-accum.jpg
    Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_13-3-124-19-18-4-accum.jpg
    72.1 KB · Views: 31
  • Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-5-58-accum.jpg
    Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-5-58-accum.jpg
    60.8 KB · Views: 34
  • Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-8-17-accum.jpg
    Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-8-17-accum.jpg
    63.8 KB · Views: 30
  • Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-11-27-accum.jpg
    Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-11-27-accum.jpg
    93.6 KB · Views: 31
  • Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-14-51-accum.jpg
    Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-14-51-accum.jpg
    98.6 KB · Views: 32
  • Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-19-33-accum.jpg
    Screenshot_dg_isdera_commendatore_112i_beta_ks_nordschleife_14-3-124-9-19-33-accum.jpg
    119.6 KB · Views: 26
I converted it from GTR2 eons ago but yeah, being a GTR2 model it looks like peepeepoopoo.


View attachment 1346403
View attachment 1346404
View attachment 1346405
View attachment 1346407

All I have are those screenshots; the mods are on my dead PC so can't retrieve these POS.

If ya want them so much I could start all over again tho. But it's huge - there's, like, a gazillion body variants.
Damn, too bad it is on the dead PC :( I've always been shocked that V_LM did almost all the variants. While redoing the project would be great, I don't think it is necessary at least for me
 
Hello guys, does someone my know if there are the 1994 versions of Spa, Montreal and Barcelona existing?

Not in the list at least...
 
You will see a difference if everything comes together in the near future. It is related to everything, but actually if all works it will make the work on mods (cars and tracks) much easier, because the colors are then rendered correctly and more smooth. It just annoys me that it comes in the middle of a very solid work, but sure i see the potential and AC/CSP can compete with the newest graphics engines then (color wise for now).
The only thing I would regret would be to lose all the work done up to now and start over from the beginning.
Now PURE is more realistic and feature-rich than ever before.
Thank you Peter!!
 
Edit: Also, shifting is currently set up as h-pattern, but shouldn't this car be sequential?
Should perhaps be SUPPORTS_SHIFTER=0 in drivetrain.ini?
I don't think sequential trans are that common in the 80s for these type of cars. Even later cars like the XJR-14 were still H-pattern manual cars....
 
Another skin made for 2003 LM24h.

It was particularly easy attending the base skin was already made for ALMS and were are only few logos to do or change. I Don't know who was the original author for the MkIII skins, but I figure out that is from somebody near this forum, so thanks mate.
That's for 2002 Riley & Scott MkIII C Elan V8
preview.jpg



You may find it on this link.

After it, I should start doing Japan Team Goh #5 Audi R8 (image below) but before I would like to know if someone has done it or knows if it's been published and I'm not able to find it.
A176304_web_2880.jpg
 
Last edited:
Edit: Also, shifting is currently set up as h-pattern, but shouldn't this car be sequential?
Should perhaps be SUPPORTS_SHIFTER=0 in drivetrain.ini?

This says:

Transmission:
5 Manual Hewland VGC
 
The only thing I would regret would be to lose all the work done up to now and start over from the beginning.
Now PURE is more realistic and feature-rich than ever before.
Thank you Peter!!
It's definitely not loosing features. Its all about restoring Pure with LCS exactly to what it is now plus new features. I made my roadmap for the transformation and I take it as an opportunity to also rebuild the fog engine of Pure and then maybe there will be a new section in Pure Config to customize fog again like in Sol but better.

So I try to use the Pure gamma version as a reference and Pure LCS will be 99% of it. So the main goal is to prevent a negative visual change and create a clone but with LCS support. That's the stability I'm trying to achieve.

In the last days i had a steap learning curve and found out many things and now i have the first positive feelings about it.
 
Last edited:
Another skin made for 2003 LM24h.

It was particularly easy attending the base skin was already made for ALMS and were are only few logos to do or change. I Don't know who was the original author for the MkIII skins, but I figure out that is from somebody near this forum, so thanks mate.
That's for 2002 Riley & Scott MkIII C Elan V8
View attachment 1346547


You may find it on this link.

After it, I should start doing Japan Team Goh #5 Audi R8 (image below) but before I would like to know if someone has done it or knows if it's been published and I'm not able to find it.
View attachment 1346553

Not exactly the same, but...

2002 LM:
preview.jpg


Pre-quali tests:

preview.jpg

LM 2003:

preview.jpg


Spa 2003:

preview.jpg



LM 2004:

preview.jpg



made for the PC port / RMS reworked R8 LMP (with help from andrevr for the PROCOEUR and the star logos)
 
In the last days i had a steap learning curve and found out many things and now i have the first positive feelings about it.
Really glad to hear that Peter. I can definitely see the potential of LCS, especially in HDR.

Can't wait to see a compatible version of Pure: LCS needs you! Particularly skyboxes and dynamic weather
:cheers:
 
Last edited:
Will these drive differently?
I haven't changed anything yet (in the DATA folder)...the cars that still need to be converted (partially)...which would be Brabham, McLaren, Cooper and BRM from (1968)...I intend to use this car as a "base car" (just like in 1969)...and then test them and analyze what can be changed (to make them a little different from each other).
 
I have these cars set up in a few custom championships, but they are mostly single track endurance. Did these cars run any regular championships at all, in which they run a series of different tracks through a season?

VRC protos 2003

2024-04-14 14_43_08-F1 1958 Vanwall VW5.png


Also wondering about the VRC protos 2019 and the Proto C's from the 80s/90s...
 
It's definitely not loosing features. Its all about restoring Pure with LCS exactly to what it is now plus new features. I made my roadmap for the transformation and I take it as an opportunity to also rebuild the fog engine of Pure and then maybe there will be a new section in Pure Config to customize fog again like in Sol but better.

So I try to use the Pure gamma version as a reference and Pure LCS will be 99% of it. So the main goal is to prevent a negative visual change and greater a clone but with LCS support. That's the stability I'm trying to achieve.

In the last days i had a steap learning curve and found out many things and now i have the first positive feelings about it.
robert redford yes GIF
 
I've been thinking about doing a retro skin for the Corvette for some time now...well it was a late night of last! So this is the result, it's for the urd_michigan_gtd . Complete with crew.

20240414-142526-rt_sebring-urd_michigan_gtd.jpg


20240414-142712-rt_sebring-urd_michigan_gtd.jpg


preview.jpg

https://mega.nz/file/Txx2iK6S#eP9OLmhbqr60B93sdee9DbObF6qRpmAp0k34uktPNhA
Updated link.:banghead:

I forgot to change the car number to 52 in the skins ui.json file. It can be corrected in wordpad & saved.
 
Last edited:
Sharing a mod? Host it on GTPlanet Downloads. Free, public hosting for files up to 10GB in size.
Back